PHAEMA manual ยท Key dates

Compliance and building information

The compliance module keeps the certificates each building needs, warns before they expire, tracks the actions they call for, and holds the building's information (the "Golden Thread") for the life of the building. It is on unless an administrator switches it off in Module settings. Find it under Buildings, Compliance in the menu, and on each property page.

Setting up a property

On a property's compliance page, select Choose the certificates this property needs and tick those that apply, for example:

Certificate Usually valid for
Fire risk assessment 12 months (review)
Fire alarm inspection and service 6 months
Emergency lighting test 12 months
Gas safety record 12 months
Electrical installation condition report (EICR) 5 years
Legionella risk assessment 2 years
Asbestos register and management plan review 12 months
Lift thorough examination 6 months
Energy Performance Certificate (EPC) 10 years
Display Energy Certificate (DEC) 12 months

Administrators can change the periods, or add their own certificate types, under Manage data, Compliance types. Check them against the council's own policies and risk assessments.

PHAEMA suggests who holds each certificate. A tenant on full repairing terms of the whole property holds its own certificates and the council keeps a copy; otherwise the council holds them. Change it for any certificate.

The register can be filtered by certificate, who holds it, building or estate (including its units and parts) and managing surveyor; the figures at the top follow the filters.

Recording a certificate

Select Record a certificate, choose which, and enter the date, the result and the PDF. PHAEMA works out the expiry from the usual period, or enter the date on the certificate. For an EPC or DEC, enter the rating.

The compliance register The register, worst first.

Status Means
Valid In date, nothing outstanding
Actions open In date, with remedial actions still to do
Expires soon Expires within 60 days: book the next inspection
Expired, Missing or Unsatisfactory Shown red on the dashboard and the compliance page

Remedial actions

Type any actions from the certificate or assessment, one per line, with a priority: high (7 days), medium (30 days) or low (90 days). Each is tracked until marked Done. With maintenance switched on, Raise a repair job turns an action into a job for a contractor.

Golden Thread tiers

PHAEMA keeps building information to three tiers:

A building's compliance page A building's certificates, actions and Golden Thread information.

Tier For
A, statutory Higher-risk buildings in England (at least 18 metres or at least 7 storeys, with at least two residential units) and buildings in scope in Wales
B, best practice Other buildings under the Fire Safety Order: kept to the same principles
C, minimal Land and simple assets: title, plans and inspection history

Use Screen this building to record the country, height, storeys and number of homes, and the responsible person under the Fire Safety Order. PHAEMA suggests the tier; an officer confirms it, and PHAEMA records who and when. For tier A buildings, record the accountable person. The Welsh regime is still being brought in, so PHAEMA flags Welsh buildings with homes for an officer to check rather than deciding.

Building information

Add a document or a new version keeps plans, fire safety information, health and safety files, operation and maintenance manuals, surveys and other documents by category. A new version supersedes the old one, which is kept in the history: building information is never deleted.

Open data

When an administrator ticks Publish open data in Module settings, PHAEMA publishes, without signing in, at /open-data/:

  • Land and assets: every property, as the Local Government Transparency Code requires;
  • Property available: vacant lettable property.

Each is available as CSV, JSON and GeoJSON (for maps), under the Open Government Licence. Properties marked Exclude from open data, and anything that is part of them, never appear. Link to the page from the council's website.

Reports

The Compliance ready-made reports cover certificates expired, certificates expiring in 60 days, remedial actions overdue, and EPCs rated F or G, which are below the minimum standard for letting.

Worked example

DM-N04 Northfield Leisure Centre needs ten certificates. The register shows its air conditioning inspection (TM44) as missing and its emergency lighting test as expired. The fire risk assessment is in date but has an action open (clear the escape route behind the sports hall), and one done (the plant room door closer). Its Golden Thread screening is tier B, with the leisure trust as responsible person day to day. DM-N01-U04, a vacant unit, has an EPC rated G, so a new letting case for it shows a minimum energy efficiency warning.